Assignment Task


Task 

Allawah, Carlton and Kogarah Bay Traffic Management
The local communities of Allawah, Carlton and Kogarah Bay situated in the Georges River Local Government Area are concerned about road traffic congestion and speeding within the vicinity of Park Road and Princes Highway. The specific area of concern is presented in Figure 1.

A-Plus Writing Help For University Students

Get expert assistance in any academic field. All courses and programs covered.

Get Help Now!
Figure 1: Study Area (Source: Google Maps)


The study area consists of a number of different land uses including a schools, commercial and leisure activity centres, and at the northern end of Lancelot Street (north of Park Road), the Allawah Train Station.
Your consultancy firm has been asked by governing authorities to complete an assessment of the traffic conditions to quantify, evaluate and resolve some of the communities concerns. As the lead Traffic Engineer, you are faced with the problems described in the following pages of the brief.
Prepare a response to each of the problems in the form of a brief report (technical note). Ensure you succinctly present any working or descriptions of methodology and use summary tables to display your results. Do not provide an excel spreadsheet as a response.


Problem 1: Southbound Speeding along Park Road 
Residents have noticed the presence of speeding vehicles travelling southbound along Park Road, north of the intersection at Princes Highway (refer to Figure 2). 

Map of Park Road and location of pneumatic tube survey

Figure 2: Map of Park Road and location of pneumatic tube survey
In order to investigate the complaint, a traffic survey has been conducted on Park Road (highlighted in red). The survey used automatic tube vehicle counts (pneumatic tubes) which collected speed and volume data between 07/03/2022 and 13/03/2022 (7 day survey period). The data is presented in the associated spreadsheet (“48370 Assessment Task 3 – Traffic Survey Data”).
As the local Traffic Engineer, use the data to answer the questions on the following page and address the concerns of the community.


a) Within the provided data set are there observations where zero vehicles were recorded (Flow = 0)? Hypothetically if we did observe zero vehicle data, do we include this data in our assessment? Discuss the potential issues of including and excluding these observations within our data set. 
For the remainder of the questions, remove the observations where zero flow occurs (if they are present in the data set).

b) What is the speed limit of Park Road for the direction of travel that residents are concerned about? Is the speed limit appropriate in the context of the adjacent land uses and connectivity to the rest of the road network? Justify your response with clear reasoning. 

c) Determine the daily time mean speeds and the time mean speed for the entire survey period for both directions of travel.
d) Determine the daily space mean speeds and the space mean speed for the entire survey period for both directions of travel.
e) Using the data provided, what proportion of average speed (across an hour) measurements were in excess of the posted speed limit (considering both directions of travel)? Is speeding a problem based on the findings of part c), d) and e)? Can this assessment alone validate or invalidate the residents concerns? Justify your response with clear reasoning. 
f) Using the fundamental relationships of traffic flow and linear regression (use Microsoft Excel) define the Greenshields model (speed-density relationship) for ONLY the southbound direction of Park Road. Briefly describe your methodology and clearly identify the mathematical relationship. 
g) Is the derived model a good fit for the observed data? Use a statistical measure to justify your answer. 

h) Based on the results of part f) determine the mathematical relationship (present the equations) between speed and flow as well as the relationship between flow and density. 
i) Based on the Greenshields model, calculate the following properties of the southbound direction of Park Road: 
i. Free flow speed
ii. Jam density
iii. Capacity

j) Considering the analysis completed in parts c) to i), discuss the traffic conditions on Park Road and the response you would provide to the residents regarding their complaint. What further data collection would you complete to provide a more comprehensive assessment? Cleary justify your response (1/2 page, bullet point arguments are preferred).


Problem 2: Queuing on Park Road 
Residents have also recognised the presence of extensive queuing at the northern approach of the intersection of Park Road and Princes Highway. Of specific concern is the queuing of vehicles travelling southbound along Park Road attempting to turn right into Princes Highway. This means queues exceed the capacity of the right turn bay and affect adjacent through traffic lanes on Park Road (refer to Figure 3). 

Intersection of Park Road and Princes Highway (Depiction of Right Turn Movement from Park Road to Princes Highway)

Figure 3: Intersection of Park Road and Princes Highway (Depiction of Right Turn Movement from Park Road to Princes Highway)


Assess the following scenario using a Deterministic Queueing Analysis:
The intersection of Park Road and Princes Highway is signalised and the conditions for the right turn movement from Park Road to Princes Highway received the following timing pattern:

  • Effective Green Time (includes the green phase plus a component of the amber phase): 10 seconds
  • Effective Red Time: 80 seconds

In general, during peak periods, a flow rate of 360 vehicles per hour travel south along Park Road and turn right into Princes Highway. Assume a uniform arrival pattern.
The capacity of the right turn bay is 10 vehicles. 


The signalised intersection can service 4 right turning vehicles during a 10 second effective green period (consider linear service rates).

As signalisation is based on the Sydney Coordinated Adaptive Traffic Systems (SCATS), when queuing is greater than the capacity of the right turn bay, the timing pattern “adapts” to clear congestion. The modified timing pattern is as follows:

  • Effective Green Time: 25 seconds
  • Effective Red Time: 65 seconds

The modified timing pattern is active until there are no vehicles queuing at the turn bay at the conclusion of an effective green phase.
Assume that there are zero vehicles queuing at the outset of your assessment and the first phase encountered by the right turning vehicles is a “red phase” (effective red time).

Given the above conditions answer the following questions?
a) How many vehicles queue in the turn bay at the conclusion of the first cycle length of the assessment (at the conclusion of the first effective green time period)?
b) When the modified timing pattern is activated, how many vehicles can be cleared from any queue present at the right turn bay? 
c) Draw the cumulative arrival and cumulative departure graph for the queuing scenario.

The drawing must present cumulative arrivals and departures until the modified signal timing plan is deactivated. Use the time unit of “seconds” when preparing the graph. Clearly present the arrival curve and the departure curve (in different colours) and label both axes (include units). 

d) Does this example depict a sustainable queueing event? Clearly explain your response by defining sustainable queuing and then presenting evidence.
e) What is the maximum queue of vehicles? What time does it occur (measured in seconds from the time of beginning the assessment)? Approximate the queue length
(in metres). Does this queueing event confirm residents’ complaints of excessive queuing? 
f) How long does it take for the queuing event to clear (deactivation of the modified timing plan)? What is the total delay of the queuing event? Calculate the number of
vehicles that will be affected by the queuing event and the average individual delay of the vehicles affected. 
g) Propose two possible traffic management solutions to alleviate the queueing concerns raised by the community. 


Problem 3: Proposals for “Shared Space” concept applications 
The Allawah, Carlton and Kogarah Bay study area contains a number of “Local Area Traffic Management” features to improve road safety, encourage pedestrian and cyclist movements and achieve a more accessible township. However, as described in the complaints from the previous problems, residents are still concerned about operations and, more importantly, safety. Therefore, it is necessary to determine further solutions to alleviate community concerns.
a) Propose 2 “Local Area Traffic Management” features (devices) that support the objectives of managing traffic local area traffic. Clearly note the device used, the intended purpose of the device, and the location of the device (this can be presented on a map, you can use Google Maps).

This Engineering Assignment has been solved by our Engineering Expert at TV Assignment Help. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. 

You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction

Welcome to our Online Essay Writing Agency. Securing higher grades costing your pocket? Order your assignment online at the lowest price now! Our online essay writers are able to provide high-quality assignment help within your deadline. With our homework writing company, you can order essays, term papers, research papers, capstone projects, movie review, presentation, annotated bibliography, reaction paper, research proposal, discussion, or another assignment without having to worry about its originality – we offer 100% original content written completely from scratch

We write papers within your selected deadline. Just share the instructions

PLACE YOUR ORDER