Assignment task:
Your team is required to prepare a thermodynamic evaluation and conceptual-level proposal for a low-cost reconfiguration of an existing steam power plant. The operator wishes to optimize the thermodynamics to increase the plant power output while maintaining the current fuel consumption.
The existing steam power plant consists of one high (HP), one intermediate (IP) and one low-pressure (LP) turbine, connected to a three-phase electrical generator. Superheated steam for the turbines is produced in a simple water-intube boiler and superheater. The steam generator has the capacity for a single reheat. Reheating of the steam is currently done between the high and intermediate-pressure turbines. A closed feedwater-heater (CFWH) and pump combination are utilised as a regenerator. An air condenser with a pump operating at maximum output returns the liquid water to a mixing chamber to complete the thermodynamic cycle.
The steam turbine specifications indicate a maximum turbine operating temperature and pressure of 560°C and 120 bar respectively. The condensing pressure is specified as a maximum of 0.9 bar. Up to four turbine steam-extraction points are permitted at various pressure levels up to 45 bar. The source of heat for the steam generator is an external furnace. It combusts natural gas at 15% excess air. The combustion products are exhausted directly to the atmosphere. The natural gas has a composition (by volume) of:
Methane, CH4 80.9%
Ethane, C2H6 8.8%
Propane, C3H8 5.2%
n-Butane, C4H10 2.3%
Carbon dioxide, CO2 0.9%
Nitrogen, N2 1.9%
Faster than expected turbine blade deterioration has been observed in the low-pressure turbine, leading to excessive maintenance costs.
Ambient air temperatures range from 1°C to 25°C at the plant site with a year-round average of 12°C. A large aquifer ground water source is available on-site. Several spare CFWH heat exchangers and pumps (as used in the existing plant), are in storage and available for use. Additional piping, valves, throttles, mixing chambers, etc. are expected low-level costs. Any other items proposed, must be discussed with the client before submission of the proposal. A data set is available (in appendix A) for thermodynamic analysis of the current steam power plant.
Deliverables:
A report is required with a maximum length of six pages for the body of the document. This report must detail the results of the thermodynamic analysis of the existing plant, the proposed plant modifications and the expected performance improvements. Each change proposed should be justified in the report by logical, fundamental thermodynamics-based arguments. The report must include process (T-s) and flow diagrams of the existing and proposed plants. The process diagrams should be superimposed on the same saturation dome to graphically illustrate the improvements in plant performance. It is expected that this plot will take up a whole page of the report. To substantiate the performance claims in your report, your submission should include two appendices; the first should contain the detailed hand-written thermodynamics calculations for the existing plant and the second should contain the hand-written calculations for the proposed plant. The body of the report should not contain any thermodynamics calculations. Please do not include any additional appendices.
This Engineering Assignment has been solved by our Engineering Expert at TV Assignment Help. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered.
You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.
Welcome to our Online Essay Writing Agency. Securing higher grades costing your pocket? Order your assignment online at the lowest price now! Our online essay writers are able to provide high-quality assignment help within your deadline. With our homework writing company, you can order essays, term papers, research papers, capstone projects, movie review, presentation, annotated bibliography, reaction paper, research proposal, discussion, or another assignment without having to worry about its originality – we offer 100% original content written completely from scratch
We write papers within your selected deadline. Just share the instructions