Approved-online-essay-writers

CPC50210-Residential Low rise Constructions – Engineering Assignment Help

Assignment Task

Task


Part 1: Practical Tasks

A-Plus Writing Help For University Students

Get expert assistance in any academic field. All courses and programs covered.

Get Help Now!

Scenario:

You are employed by RB Holdings as an Assistant Construction Manager; your role is to provide Joe Lurgano the Construction Manager with a wide range of assistance. Joe has given you a set of plans for alterations and additions to the dwelling for Mr and Mrs Brown at 1 Lake Rd Toronto NSW. The plans have not been finalised and approved but have been issed to the client for comment. You have worked with this client a number of years ago, as RB Holdings built the original dwelling. The project is a top floor addition and a new games room and outdoor pergola space. Using the set of  Mr and Mrs Brown Alterations and Additions-V319 (Topic_Building_SR3) he would like you to start preparing for the construction and has given you a number of tasks to do to ensure the project plans and specifications meet the legislative and planning requirements, environmental standards, safe work practices and structural integrity.

Joe has asked you prepare a professional portfolio of the information found by your research for the following tasks. Your portfolio should be formatted and worded in a professional manner to demonstrate written skills commensurate with your position in a building company. You will be meeting with Joe in Part 2 of this assessment to discuss your findings.

Task 1 – Project documentation is collected and analysed

Task 1.1 

Research and collect the working plans and specifications, the Lake Macquarie Development Control Plan (LMDCP), and other relevant information to determine the minimum boundary offsets required and note if the proposed alterations and additions are compliant with local regulations. The dwelling is in an R2 Residential Zone. 

Review the relevant parts of the LMDCP and complete the table below to identify the compliance of the proposed alterations and additions.


Task 1.2

Analyse the working plans and specifications and the NCC 2019, and summarise the high wind, alpine environments and earthquake compliance requirements relevant to the proposed alterations and additions.

1. Researced the plans and specifications, the Lake Macquarie Development Control Plan (LMDCP), and other relevant information to determine the minimum boundary offsets required. 

2. Noted if the proposed alterations and additions are compliant with local regulations. 

3. Analysed the plans and specifications and the NCC 2019, and summarised the high wind, alpine environments and earthquake compliance requirements relevant to the proposed alterations and additions.


Task 2.1

Complete the following tasks to provide a detailed description of the construction items below, to be placed into your portfolio. 

a) The floor covering to the games room is marked on the plans as timber or carpet (Room Schedule), however the client has said they may use ceramic tiles. 
Research the Codes and Standards and advise Joe on the addittional requirements to the slab if the ceramic tiles were to be used.

b) Research the Codes and Standards to advise Joe in your portfolio on the requirements for the slab edge beam given the information in the SMEC Testing Services Geotechnical Report-V919 (Topic_Building_SR6), including beam sizes and reinforcment steel requirements. Disregard the footing and pinning arrangements to the exsiting slab for this task.

c) Given the results of your research on the requirements for the slab edge beam in (b) above, use the RB holdings email template to draft an email to the structural engineer, Mr Sam Sturdy of Uprite Engineering Services Pty Ltd, and request him to confirm the results of your research. 


Task 2.1

1. Researched the Codes and Standards and documented the addittional requirements to the slab if the ceramic tiles were to be used.. 

2. Researched the Codes and Standards and documented the requirements for the slab edge beam given the information in the SMEC Testing Services Geotechnical Report including beam sizes and reinforcment steel requirements.

3. Drafted an email to the structural engineer and requested him to confirm the results of your research and request the details regarding the footing size and pinning details of the games room slab abutting the existing slab.


Task 3 – Floor systems.

Task 3.1
In this task you will be using the plans and specifications to investigate the existing first floor specifications and assess the suitability of an alternative material, for the upper storey floor joists. 

a) Examine the plans to determine what is proposed by the architect and explain the reasoning for this choice.

b) Research the codes and standards, to confirm the final size of a timber joist alternative given the following specification: 

  • •Wind Classification N1/N2
  • Seasoned Softwood 
  • Stress Grade MGP 15

Task 3.1 Student Checklist

To successfully complete Task 3.1 you must have:

1. Investigated and assessed the suitability of an alternative material, for the upper storey floor joists

2. Explained the reasoning for the architect’s choice of the material

3. Researched the codes and standards, to confirm the final size of a timber joist alternative 


Task 3.2

Joe Lugano has asked you research and provide a detailed portfolio on the new and developing ‘Floor Cassette Systems’ becoming popular in the Australian construction industry. Your research and portfolio must include the following items:

a) Research various manufacturers of the product and provide a detailed description of a selected product that will include pictures, diagrams and data tables 

b) Describe the advantages of this alternative flooring system compared to traditional methods and how its application will affect current construction processes. 

c) Assess the technology for its compliance with the NCC 2019 (BCA) by detailing how it meets the required performance criteria and DTS provisions. Provide a description of the methods of ‘evidence of suitability’ that has been provided to meet the performance provisions.


Task 3.2 Student Checklist

To successfully complete Task 3.1 you must have:

1. Researched the ‘Floor Cassette Systems’ that includes: 
a. Manufacturers of the product providing a detailed description include pictures, diagrams and data tables. 
b. Advantages of the system and how its application will affect current construction processes 
c. Assessed compliance with the NCC and evidence of suitability methods.


Task 3.3

Joe Lugano has read your portfolio on the Cassette Floor System and would like to incorporate it into the alterations and addittions to the dwelling for Mr and Mrs Brown. He has asked that you investigate the manufacturer’s installation recommendations to develop a document to be used by site supervisors, as an installation quality and compliance checklist. 


Task 3.3 Student Checklist

To successfully complete Task 3.3 you must have:

1. Investigated the manufacturer’s installation recommendations and developed an installation quality and compliance checklist. 
 

This CPC50210-Engineering Assignment has been solved by our Engineering Expert at TV Assignment Help. Our Assignment Writing Experts are efficient to provide a fresh solution to this question. We are serving more than 10000+ Students in Australia, UK & US by helping them to score HD in their academics. Our Experts are well trained to follow all marking rubrics & referencing Style. Be it a used or new solution, the quality of the work submitted by our assignment experts remains unhampered. You may continue to expect the same or even better quality with the used and new assignment solution files respectively. There’s one thing to be noticed that you could choose one between the two and acquire an HD either way. You could choose a new assignment solution file to get yourself an exclusive, plagiarism (with free Turn tin file), expert quality assignment or order an old solution file that was considered worthy of the highest distinction.

Welcome to our Online Essay Writing Agency. Securing higher grades costing your pocket? Order your assignment online at the lowest price now! Our online essay writers are able to provide high-quality assignment help within your deadline. With our homework writing company, you can order essays, term papers, research papers, capstone projects, movie review, presentation, annotated bibliography, reaction paper, research proposal, discussion, or another assignment without having to worry about its originality – we offer 100% original content written completely from scratch

We write papers within your selected deadline. Just share the instructions

PLACE YOUR ORDER